2019

Refused Application

The plan to the right demonstrates the previous planning application for land north of Maldon Road, Tiptree for 255 new homes. The application was refused at appeal due to the proposal’s potential to ‘close the gap’ between Tiptree and Tiptree Heath and bring harm to the rural character and identity of both settlements.

Refused masterplan
Refused masterplan

October 2024

Initial Masterplan

Following the applications refusal, Bloor Homes amended the proposals in light of the guidance contained within the appeal decision and presented these revised proposals in October 2024. Key amendments to the design proposals were as follows:

  • Providing a landscape buffer between proposed built form and the site boundary, to the West.
  • Amended access location – Access moved further East to help create the new landscape buffer.
  • Reduced the developable area.
  • Remove & reshaped the retained land for a potential future roundabout at the site entrance.
Initial masterplan
Initial masterplan

December 2024

Revised Masterplan

Following feedback received on the initial masterplan, Bloor Homes developed the proposal where several elements of the proposals were improved including:

  • The inclusion of pedestrian footpaths throughout the site connecting to existing PROWs.
  • Adding in areas of 1 storey dwellings to address Peakes Close and the bungalows situated here.
Revised masterplan
Revised masterplan

January 2025

Proposed Masterplan

Ahead of the submission of the application, the proposed masterplan was further developed by:

  • Creating focal points for key buildings to be located within the site.
  • Including more pedestrian footpaths throughout the development connecting to PROWS.
  • Adding more landscaping buffers around the developable areas.
  • Adding a controlled pedestrian crossing over Maldon Road.
  • Adding surfaced footway to Maldon Road at the North Eastern end of the site ensuring drainage proposals are outside the RPA of existing trees.
Proposed masterplan
Show keyHide key
  • Access point
  • Pedestrian access points
  • Site boundary 10.33 Ha (25.5 acres)
  • Existing public rights of way
  • Primary streets
  • Secondary streets
  • Tertiary streets
  • Walking routes
  • Residential development for up to 165 dwellings (5.39 Ha / 13.3 acres)
  • Single storey residential development
  • Additional school parking area (30 spaces)
  • Existing primary school
  • Attenuation basins
  • Public open spaces
  • LEAP
  • Swales
  • Proposed trees
  • Existing hedges
  • Existing trees
Proposed masterplan
Close